JSC "Concern Energomera" Corporate site
rus/eng
About company Products Contacts Service Press-centre
Home / Press-centre 
Hot line: 8-800-200-75-27

Press centre

News Press-releases Articles

News

March 13, 2012
The Territory of Smart Metering – “Smart Metering” AMR system in “PermEnergo”
"Smart Metering" AMR system was put into trial operation in the Production Department of "Perm Electric Networks", a branch of JSC "IDGC of Ural" – "PermEnergo".
More»
March 06, 2012
Withdrawal from production
Three-phase multi-rate electricity meter CE301M is withdrawn from batch production from March 01, 2012.
More»
March 01, 2012
Service software AdminTools 3.3b Service pack 3
Service pack of technology Software AdminTools v3.3b SP3, designed for configuration, adjustment and control of “Energomera” electricity meters was developed.
More»
February 15, 2012
AMR system at power facilities of JSC “INTER RAO UES” Orlovsky branch, Orel.

AMR system on the basis of “Energomera” Technical Means Complex was put into trial operation at power facilities of JSC “INTER RAO UES” Orlovsky branch, Orel.

More»
January 27, 2012

Software “Data Processing Center” 2.7

The installation package of Software DPC 2.7 of “Energomera” Technical Means Complex – “Residential customer” was developed, as well as user and system programmer’s guides.
January 12, 2012
Updated server software
Concern "Energomera" developed updated versions of server software for the popular models of metrological equipment.
More»
December 23, 2011
Certification TUV NORD CERT ISO 9001:2008
In November 2011 CJSC "Electrotechnical factories "Energomera" has passed the recertification according to ISO 9001:2008. More»
December 13, 2011

PNKZ-PPCH-M10 “B” series

Concern "Energomera" completed the development and produced the test sample of converter for cathodic protection PNKZ-PPCH-M10 "Energomera" of "B" series. Start of batch production is the 2nd quarter of 2012.
December 09, 2011
AMR system was put into trial operation in main step-down substation-70 of “Skalistaya” mine, “Komsomolsky” mine, Norilsk

AMR system on the basis of "Energomera" Technical Means Complex with data transmission via interface RS-485 was put into trial operation in main step-down substation-70 of "Skalistaya" mine, "Komsomolsky" mine, Norilsk.

More»
December 02, 2011
The pilot project of AMR system was put into trial operation in "Kuzbass electric grid company" LLC, Kemerovo

The pilot project of AMR system on the basis of "Energomera" Technical Means Complex with data transmission via network of 0,4kV was put into trial operation in "Kuzbass electric grid company" LLC, Kemerovo.

More»
 1 2 3 4 5 6 7 8 9 10 › »
Exhibitions
CJSC «Electrotechnical factories «Energomera»
Copyright © 2001- CJSC «Electrotechnical factories «Energomera»